M3M Elie Saab Site Visit Checklist: 15 Checks Before You Pay
A brochure shows how a home should look. A site visit shows what you can see, ask and check. Before paying a booking amount at M3M Elie Saab in Sector 111, Gurugram, on the Dwarka Expressway, do both. This checklist uses Haryana RERA (HRERA) records so you can compare what you hear with what is on file.
Short answer: Check the RERA record, your exact tower and unit, the agreement area, written specifications, the full cost sheet, the contractual completion date and the draft Agreement for Sale. Do all this before you pay.
Why visit before booking?
A visit shows the site, roads, entry point and how the sales team handles hard questions. But if the tower is under construction, you will mostly see a sales gallery or sample unit. Ask which one it is. A gallery is made to impress; papers are made to bind.
Under Section 13 of the RERA Act, a promoter cannot take more than 10% of the price as advance before a written, registered agreement for sale. New to the law? Read what RERA is and why it matters for home buyers. There is no need to rush. If someone pushes you to pay fast, ask for the papers first.
What does HRERA show for this project?
| Item | HRERA record |
| Project name | "M3M Elie Saab at SCDA"; renamed "M3M Residences by Elie Saab" (amendment uploaded 24 Dec 2025) |
| Registration no. | GGM/992/724/2025/95, dated 16.10.2025, approved |
| Promoter | Metro Education & Welfare Pvt Ltd (collaborator on licensed land) |
| Location | Sector 111, Gurugram |
| Land | 2.7505 acres, part of a 15.99375-acre licence (DTCP 213 of 2022, valid to 26.12.2027) |
| Towers/units | 3 towers; 336 units at registration, 296 after the July 2026 addendum |
| Completion | Registration valid to 29.02.2032; application form lists 30.09.2032 |
| Pending approvals | Fire scheme and service plans "not submitted" on 13.10.2025; fresh six-month deadline in 2026 addendum |
15 things to check during the visit
1. Location and access. Get the exact site address and the gate residents will use. Ask: Is the access road open today? Which part of the licensed land is my tower on? Proof: site plan, zoning plan, licence number. Tip: Visit once at a busy weekday hour to see real traffic.
2. HRERA registration. Open haryanarera.gov.in, search "Elie Saab" and GGM/992/724/2025/95. Compare name, promoter, validity, addenda, carpet areas and specification form. Ask: Which company signs my agreement? Which bank account receives payments? Proof: registration certificate. Tip: Pay only into the account named in your agreement and save a dated screenshot of the HRERA page.
3. Developer, promoter and Elie Saab roles. M3M India is the developer brand, Metro Education & Welfare is the promoter on record, and Elie Saab is the Lebanese fashion house. Press coverage mentions Elie Saab Maison furniture and décor. HRERA asked the promoter for trademark details, but the brand's exact role is not spelled out in the records we read. Ask: What exactly did Elie Saab design? Is furniture included in the price? Who is responsible for construction and repairs? Proof: written scope of the brand's role. Tip: Ask "which agreement clause promises this?" If none does, it is only a talking point. For background, see what M3M Elie Saab is and why it exists and why luxury brands enter real estate.
4. Sample unit vs final unit. A sample is a display; finishes, furniture and sizes can differ. Check ceiling height, windows, tile joints, fittings and kitchen counters. Ask which items are display only (sofas, curtains, lights, smart devices, art). Proof: signed inclusion list. Tip: Mark each item "included" or "display" on your plan and get it initialled.
5. Layout and usable space. Check room sizes, balcony depth, storage, door swings, pillars, shafts and AC unit positions. Confirm any "utility" or staff room for your unit. Proof: unit plan with dimensions. Tip: Mark your furniture sizes on the plan before the visit. See the M3M Elie Saab floor plan and 4 BHK layout guide.
6. Carpet area and other measurements. RERA defines carpet area as net usable floor area, including internal walls but excluding external walls, shafts and exclusive balcony. Built-up adds wall thickness and balcony; super built-up adds common areas. HRERA lists carpet areas of 169.27 to 203.64 sq m (about 1,822 to 2,192 sq ft) across ten unit types, while marketing quotes 4,200 to 4,650 sq ft. These measure different things, so get the full breakdown. Carpet figures come from the original filing; plans were revised in July 2026. Proof: area statement for your unit. Tip: Divide the price by both carpet and quoted area to see the real per-sq-ft rate.
7. Materials and specifications. The HRERA form lists items like vitrified tiles or laminated wooden flooring, OBD paint and glass-and-aluminium windows. Counters, appliances, wardrobes and AC are marked "NA". The form is a basic filing; the contract may promise more, so get it in writing. Ask: Which brands and grades? Can the builder substitute materials? Proof: specification annexure with named brands. Tip: Circle phrases like "or equivalent" and ask for a named brand.
8. Amenities. List what is ready today and what is promised later. In the HRERA land-use table, clubhouse and parks show 0 acres for this phase. That does not prove there is no clubhouse, since other phases exist, but ask where each amenity sits and which registration covers it. Ask about opening dates and membership fees. Proof: site plan with amenities marked. Tip: Write down which amenity opens first, with the date.
9. Parking. Ask the type (basement, stilt, open), bays per unit, whether bays are fixed and numbered, size, EV charging and cost. Proof: parking plan and the parking clause. Tip: Ask for bay size and picture your car and the walk to your lift.
10. Orientation, light and ventilation. The 2026 addendum names towers ES-01, ES-02 and ES-03. Ask your tower, floor and facing, and what will stand in front of your windows. About 1.64 acres of licensed land is marked for future development. Proof: site plan, zoning plan, elevations. Tip: Use a phone compass; do not rely on renders.
11. Safety and security. Ask about gates, CCTV, fire exits, refuge areas and fire systems. At registration (13 Oct 2025), fire scheme approval and service plans were not submitted. The promoter lodged two security deposits of Rs 25 lakh each, and the July 2026 addendum sets a new six-month deadline, which suggests they were pending then. Proof: approved fire scheme and service plans. Tip: If you do not receive the papers, treat the answer as "not yet".
12. Maintenance and recurring costs. Understand maintenance charge (regular fee), sinking fund (future repairs) and IFMS (interest-free maintenance security). We found no public figures, so we show none. Ask the rate, how it is calculated, how often it can rise and any brand-service or power-backup charges. Proof: written estimate and draft maintenance agreement. Tip: Ask for the yearly cost for your unit in rupees.
13. Total cost and additional charges. Ask about PLC (preferential location charge), parking, club membership, IFMS, power backup, GST, stamp duty, registration and any development charges. Request one signed cost sheet showing base price, area used, every charge, taxes and total. Tip: Cost sheet, payment schedule and draft agreement must all match. See the M3M Elie Saab price list, payment plan and cost sheet guide and PLC, EDC, IDC and other charges explained.
14. Possession date. Launch coverage said 2030. HRERA shows registration valid to 29.02.2032 (the hearing brief lists it as the occupation certificate date), and the application form lists 30.09.2032. Under Section 18 of the RERA Act, if the promoter misses the agreed date, you can seek a refund with interest or stay and receive interest for each month of delay. Ask about grace period and delay-interest rate. Proof: possession clause and latest HRERA progress report. Tip: If your agreement date is later than HRERA's, ask why. For site progress, see the M3M Elie Saab construction update.
15. Booking and legal documents. The Agreement for Sale fixes price, area, specifications, dates, penalties and refunds. HRERA shows the promoter filed a draft allotment letter and draft agreement, so ask for both. Read the booking form, allotment letter, annexures, payment schedule, cancellation and default clauses. Ask: What do I get back if I cancel, and when? What if I miss a payment? Tip: Never sign blank pages. Hire an independent property lawyer. This is not legal advice.
Which documents should you verify?
| Document | What to verify |
| HRERA registration and addendum | Number, promoter, validity, units, 3 July 2026 changes |
| Registration certificate | Conditions and buyer-deposit bank account |
| Approved building and zoning plans | Your tower, floor and what is planned nearby |
| Licence and collaboration papers | Licence 213 of 2022 and the promoter's right to sell |
| Fire scheme and service plans | Approval status and dates |
| Title and land papers | Jamabandi, mutation, non-encumbrance certificate |
| Draft allotment letter and agreement | Unit, area, price, dates, delay interest, cancellation |
| Cost sheet and payment schedule | Every charge; totals must match |
| Specification annexure | Named brands and materials |
| Brand and maintenance terms | Elie Saab's role and maintenance estimate |
Is a site visit enough to decide?
No. A visit shows the place and the people, not the contract or the legal record. Afterwards, recheck HRERA, review the cost sheet, read every clause and have an independent lawyer check the drafts.
There are fair points on both sides. The project has a famous brand and a Dwarka Expressway location. But the record also shows a long timeline (registration valid to 29 February 2032), revised plans, fewer units than at launch and approvals still being finished. That is a long wait with a large sum committed. For the returns side, read the M3M Elie Saab investment and ROI guide. The written terms matter more than the sales pitch. If an answer is not in writing, treat it as not given.
Sumit Mishra / Property Counselor